3.03.2008

A new iteration is complete at a small sculpture park called the Sculpture Barn.



(http://www.sculpturebarn.com/SculptureField.htm)

A modular hardware system will enable us to experiment with many different configurations. The first iteration consumed 40 poles and took under an hour to setup. The plan is to push the configuration to test different spatial arrangements, determining the optimal setup. This is number one of ?